Mechanical 5 - Solar Panel Device
Student Team: 4 ME and 2 EM students
Advisor: T. Tollefsbol
Sponsoring Organization: T&D Program/Engineering Management
Liaison: tbd/Peter McKenny
Project Background:
Construct a mounting platform for four solar panels, design and build a device to deliver maximum electrical output from the panels throughout the day, and verify each panel provides an electrical output which is similar to specified test data.
Project Goal:
Installation and testing of four/eight solar panels.
Project Deliverables:
1. Construct suitable platform and mount solar panels
2. Measure electrical output and compare to manufacturer’s test data sheets
3. Design and build a device to maximize electrical output throughout the day
4. Complete all electrical/mechanical testing to verify overall operation.
5. Provide final reportProject Management and Communication Expectations:
1. Develop overall project plan and update weekly
2. Conduct weekly team meeting with documented minutes including assigned action items/due dates and timesheet indicating hours spent and work completed
3. Timely submission of all required interim/final project reportsProject Research:
1. Review and document all prior work in area (including history of solar panel development)
2. Methods of installing and testing solar panels
3. Estimated cost of complete installation and recommended steps to reduce costs

Contact Information
Academic Director:
Toni Boggan
Phone: 509-313-3913
Faculty Director:
Steven Zemke
Phone: 509-313-3554
502 E. Boone Avenue
Spokane, WA 99258-0026
Phone: (509) 313-3523
Fax: (509) 313-5871
Email: seas@gonzaga.edu