2013 - 2014 Senior DesignCEDE Academic CalendarCivil 1 - Stormwater MonitoringCivil 2 - Entre Creek SpawningCivil 3 - Blue Creek, Midnite MineCivil 4 - Freeman School CCI4 RemovalCivil 5 - CSO Residential Stormwater TreatmentCivil 6 - Sustainable Kitchen TechnologiesCivil 7 - Willow Creek Bridge ReplacementCivil 8 - Padhar, India Hospital FacilityCivil 9 - Bridger Bowl Ski LodgeCivil 10 - GU Structural AssessmentCivil 11 - Benin Research & Modeling of Groundwater Civil 12 - SCC Technical Education Bldg.Civil 13 - SCC Bldg 15 Addition DesignCivil 14 - Hydro Safety Grab LinesComputer Science 1 - Go LumberComputer Science 2 - Schweitzer Mobile AppComputer Science 3 - Glider Winch Host ManagerComputer Science 4 - Mobile App for GUEE & CPEN 1 - Downtown Network ModelEE & CPEN 2 - Parkinson's Voice Monitor, Stage 2EE & CPEN 3 - Wireless ElectricityEE & CPEN 4 - Winch Embedded Contoller SystemEE & CPEN 5 - SEL Wireless CommunicationsEE & CPEN 6 - The FishboxMechanical 1 - Expandable Coil MandrelMechanical 2 - Combine Feed Plate AdaptorMechanical 3 - Silica Particle SamplerMechanical 4 - Pressure Transient TestingMechanical 5 - Solar Panel DeviceMechanical 6 - EPA Sustainable Kitchen TechnologiesMechanical 7 - Bulldog Baja SuspensionMechanical 8 - Part Handling SystemMechanical 9 - RCVD Run Load DisassemblerMechanical 10 - Belt FeederMechanical 11 - Benin Groundwater Modeling
Mechanical 12 - Lifting Device for Ingots
Mechanical 13 - Winch Drum Design & AnalysisMechanical 14 - Boiling Cold PlatesMechanical 15 - Rack & Pinion Conveyor SystemMechanical 16 - the FishboxMechanical 17 - Parkinson's Voice Monitor - Stage 2Mechanical 18 - Downtown Network Model

Mechanical 12 - Lifting Device for Ingots

Lifting Device For Aluminum Ingots

Student Team: Michael Beckett, Erick Lyons, Nicholas Hall, James Youmans
Advisor: Jeff Nolting
Sponsoring Organization: Wagstaff, Inc.
Liaison: Brett Thielman/ Mike Anderson

Project Background:

Wagstaff would like to have a lifting device designed to lift aluminum ingots out of the casting pit.  The device would hang from a building crane and clamp onto the cast ingot.  It needs to be adjustable to a large range of ingot sizes and clamp the ingot with two lifting points.  Once clamped the device must remain clamped until being released by an operator.  The range adjustment and clamping should be done using a 12V battery and small hydraulic power unit that is mounted to the device and operates hydraulic actuators.

Project Goal:

Produce an ingot lifting device capable of a large adjustment range.

Project Deliverables:

1. Preliminary project plan at first review date per CEDE schedule. Plan must deliver overview of project, sponsor agreed upon target design specs, preliminary work breakdown and schedule for the full project. Plan should include other information as required to fully describe work to be completed.

2. Concept review report with sponsor signoff on overall concept by end of first semester. This report should present the concept options considered with an engineering tradeoff analysis, concluding with the chosen concept. Note: the sponsor signoff is crucial and so communication with the sponsor should be happening as the design is progress so that the final signoff is confirmation of previous communications.

3. Conduct a fabrication review with the GU shop of the 3D CAD models for manufacturability.

4. Full drawing package, bill of materials, engineering calculations and a final copy of the report by end of February to allow lead time for ordering and fabrication of the machine (or sponsor chosen portion).

Final report at end of second semester that includes contents of February report with corrections made to oversights in drawings, etc.  Report to include testing and operation results as appropriate.

Project Management and Communication Expectations:

 1. Meet face-to-face with Wagstaff early in the project to establish customer connection and set project direction. This may require iterative meetings as the team comes up to speed.

2. Communication with liaison on a 2 week interval minimum, however more communication may be required depending on the stage of the project.

3. WBS and schedule to be updated as project progresses.

4. Note: Schedule delivery of drawing package by end of February (see deliverables above).

Project Research:

TBD