2013 - 2014 Senior DesignCEDE Academic CalendarCivil 1 - Stormwater MonitoringCivil 2 - Entre Creek SpawningCivil 3 - Blue Creek, Midnite MineCivil 4 - Freeman School CCI4 RemovalCivil 5 - CSO Residential Stormwater TreatmentCivil 6 - Sustainable Kitchen TechnologiesCivil 7 - Willow Creek Bridge ReplacementCivil 8 - Padhar, India Hospital FacilityCivil 9 - Bridger Bowl Ski LodgeCivil 10 - GU Structural AssessmentCivil 11 - Benin Research & Modeling of Groundwater Civil 12 - SCC Technical Education Bldg.Civil 13 - SCC Bldg 15 Addition DesignCivil 14 - Hydro Safety Grab LinesComputer Science 1 - Go LumberComputer Science 2 - Schweitzer Mobile AppComputer Science 3 - Glider Winch Host ManagerComputer Science 4 - Mobile App for GUEE & CPEN 1 - Downtown Network ModelEE & CPEN 2 - Parkinson's Voice Monitor, Stage 2EE & CPEN 3 - Wireless ElectricityEE & CPEN 4 - Winch Embedded Contoller SystemEE & CPEN 5 - SEL Wireless CommunicationsEE & CPEN 6 - The FishboxMechanical 1 - Expandable Coil MandrelMechanical 2 - Combine Feed Plate AdaptorMechanical 3 - Silica Particle SamplerMechanical 4 - Pressure Transient TestingMechanical 5 - Solar Panel DeviceMechanical 6 - EPA Sustainable Kitchen TechnologiesMechanical 7 - Bulldog Baja SuspensionMechanical 8 - Part Handling SystemMechanical 9 - RCVD Run Load DisassemblerMechanical 10 - Belt Feeder
Mechanical 11 - Benin Groundwater Modeling
Mechanical 12 - Lifting Device for IngotsMechanical 13 - Winch Drum Design & AnalysisMechanical 14 - Boiling Cold PlatesMechanical 15 - Rack & Pinion Conveyor SystemMechanical 16 - the FishboxMechanical 17 - Parkinson's Voice Monitor - Stage 2Mechanical 18 - Downtown Network Model

Mechanical 11 - Benin Groundwater Modeling

Benin Groundwater Modeling

Student Team: Cillian Wing, Connor McGregor, Jessica Bladow
Advisor: Dean Stephen Silliman
Sponsoring Organization: Gonzaga University
Liaison: Stephen Silliman

Project Background:

Increasing levels of salinity (salts) have been found in certain wells in the Godomey well field region of Benin, Africa.  This is a worrisome find, and as such, this project will work towards determining the possible sources of this salinity.

More specifically, this project will focus on analyzing previously collected pressure response and chemical data which will be used to calibrate the current subsurface conceptual models. In order to analyze this data, team members will receive training in GMS (Groundwater Modeling System) and MATLAB. 

Project Goal:

The objective of this research project is to use numerical methods to calibrate and analyze the current conceptual models in conjunction with the previously collected data. 

Project Deliverables:

The current 2D subsurface models will be converted into 3D models.  These 3D models will then be calibrated using the pressure response and chemical data.  Finally, these models will be analyzed to determine the sources of water for the wells in the Godomey well field.     

Project Management and Communication Expectations:

Weekly group meetings will be conducted, and a WBS and schedule will be created to more clearly denote the roles of each team member.

Project Research:

TBD