2013 - 2014 Senior DesignCEDE Academic CalendarCivil 1 - Stormwater MonitoringCivil 2 - Entre Creek SpawningCivil 3 - Blue Creek, Midnite MineCivil 4 - Freeman School CCI4 RemovalCivil 5 - CSO Residential Stormwater TreatmentCivil 6 - Sustainable Kitchen TechnologiesCivil 7 - Willow Creek Bridge ReplacementCivil 8 - Padhar, India Hospital FacilityCivil 9 - Bridger Bowl Ski LodgeCivil 10 - GU Structural AssessmentCivil 11 - Benin Research & Modeling of Groundwater Civil 12 - SCC Technical Education Bldg.Civil 13 - SCC Bldg 15 Addition DesignCivil 14 - Hydro Safety Grab LinesComputer Science 1 - Go LumberComputer Science 2 - Schweitzer Mobile AppComputer Science 3 - Glider Winch Host ManagerComputer Science 4 - Mobile App for GU
EE & CPEN 1 - Downtown Network Model
EE & CPEN 2 - Parkinson's Voice Monitor, Stage 2EE & CPEN 3 - Wireless ElectricityEE & CPEN 4 - Winch Embedded Contoller SystemEE & CPEN 5 - SEL Wireless CommunicationsEE & CPEN 6 - The FishboxMechanical 1 - Expandable Coil MandrelMechanical 2 - Combine Feed Plate AdaptorMechanical 3 - Silica Particle SamplerMechanical 4 - Pressure Transient TestingMechanical 5 - Solar Panel DeviceMechanical 6 - EPA Sustainable Kitchen TechnologiesMechanical 7 - Bulldog Baja SuspensionMechanical 8 - Part Handling SystemMechanical 9 - RCVD Run Load DisassemblerMechanical 10 - Belt FeederMechanical 11 - Benin Groundwater ModelingMechanical 12 - Lifting Device for IngotsMechanical 13 - Winch Drum Design & AnalysisMechanical 14 - Boiling Cold PlatesMechanical 15 - Rack & Pinion Conveyor SystemMechanical 16 - the FishboxMechanical 17 - Parkinson's Voice Monitor - Stage 2Mechanical 18 - Downtown Network Model

EE & CPEN 1 - Downtown Network Model

Avista Downtown Network Model

Student Team: Andrew Owenson, John Lopez, Marc Carlson, Ben Rowland, Tyler Spilker
Advisor: Dr. Peter McKenny
Sponsoring Organization: Avista Utilities
Liaison: Dave James

A portion of Downtown Spokane’s electrical grid, the Metro East Network, is nearing full capacity. With load increases expected, reliable service near the network’s edges may be difficult to provide. Currently three feeders run from the Metro substation to the Metro East network. Avista Utilities asked us to design a fourth feeder to remove stress from the other three feeders and increase capacity. Adding additional cable underground poses problems from a heat-transfer perspective, so a significant portion of our efforts were spent analyzing the network from a thermal point of view. Our proposal will keep Downtown Spokane powered while maintaining the safety and reliability of an electrically robust and mechanically sound network.