2013 - 2014 Senior DesignCEDE Academic CalendarCivil 1 - Stormwater MonitoringCivil 2 - Entre Creek SpawningCivil 3 - Blue Creek, Midnite MineCivil 4 - Freeman School CCI4 RemovalCivil 5 - CSO Residential Stormwater TreatmentCivil 6 - Sustainable Kitchen TechnologiesCivil 7 - Willow Creek Bridge ReplacementCivil 8 - Padhar, India Hospital FacilityCivil 9 - Bridger Bowl Ski LodgeCivil 10 - GU Structural AssessmentCivil 11 - Benin Research & Modeling of Groundwater Civil 12 - SCC Technical Education Bldg.
Civil 13 - SCC Bldg 15 Addition Design
Civil 14 - Hydro Safety Grab LinesComputer Science 1 - Go LumberComputer Science 2 - Schweitzer Mobile AppComputer Science 3 - Glider Winch Host ManagerComputer Science 4 - Mobile App for GUEE & CPEN 1 - Downtown Network ModelEE & CPEN 2 - Parkinson's Voice Monitor, Stage 2EE & CPEN 3 - Wireless ElectricityEE & CPEN 4 - Winch Embedded Contoller SystemEE & CPEN 5 - SEL Wireless CommunicationsEE & CPEN 6 - The FishboxMechanical 1 - Expandable Coil MandrelMechanical 2 - Combine Feed Plate AdaptorMechanical 3 - Silica Particle SamplerMechanical 4 - Pressure Transient TestingMechanical 5 - Solar Panel DeviceMechanical 6 - EPA Sustainable Kitchen TechnologiesMechanical 7 - Bulldog Baja SuspensionMechanical 8 - Part Handling SystemMechanical 9 - RCVD Run Load DisassemblerMechanical 10 - Belt FeederMechanical 11 - Benin Groundwater ModelingMechanical 12 - Lifting Device for IngotsMechanical 13 - Winch Drum Design & AnalysisMechanical 14 - Boiling Cold PlatesMechanical 15 - Rack & Pinion Conveyor SystemMechanical 16 - the FishboxMechanical 17 - Parkinson's Voice Monitor - Stage 2Mechanical 18 - Downtown Network Model

Civil 13 - SCC Bldg 15 Addition Design

Student Team: Kevin Schell, Mitch Pearce, Jared Erny, Chaz Woo
Advisor: Tony Stenlund
Sponsoring Organization: Integrus Architecture
Liaison: Aaron Zwanzig

Spokane Community College’s Student Services Building has outgrown its current facility and requires additional space. The additional space of 25,000 square feet will expand the Student Services Department and provide the school with additional classrooms, administration offices, and space for The Institute for Extended Learning. We designed the structural systems of the building, which include gravity and lateral resisting systems, the foundation, and provided construction drawings and key structural details. The team compared material and design alternatives in order for the project to be cost effective and compatible with the client's needs. Our design methods will conform to current and prevailing building codes and standards to ensure safety and effectiveness during construction and the life of the building.

SCHOOL OF ENGINEERING & APPLIED SCIENCE
502 E. Boone Avenue
Spokane, WA 99258-0026
Phone: (509) 313-3523
Fax: (509) 313-5871
Email: seas@gonzaga.edu