Student Team: Oscar Marmolejo, Alyssa Imai, Alexandra Anderson, Paul Yarborough
Advisor: Jeff Nolting
Sponsoring Organization: HOTSTART
Liaison: Todd Ryan, Adam Genteman, Tony Wisniewski
HOTSTART has contracted with the ME-10 student design team to design, prototype and test a machine that will process the tanks post molding completely unattended. TPS tanks will be delivered to the autonomous machine from the Arburg plastic injection molder via a conveyor belt. After the machine has removed the sprue and de-gated the tanks, they will be transported to a metal hopper for containment. The machine must include a passive feature; in the event of a failure, the machine will not interrupt normal production of the tanks. Also, the machine shall perform a quality check on the tank, collect all waste material, and must complete tank processing within the one-minute cycle time of tank production. The tank rejection rate should be less than 3000 PPM.

Contact Information
Academic Director:
Toni Boggan
Phone: 509-313-3913
Faculty Director:
Steven Zemke
Phone: 509-313-3554
502 E. Boone Avenue
Spokane, WA 99258-0026
Phone: (509) 313-3523
Fax: (509) 313-5871
Email: seas@gonzaga.edu
